01
Identify the agreed opening-up positions and relevant design details.
02
Carefully dismantle designated brickwork and expose the cavity.
03
Record cavity depth, interfaces, obstructions and existing barrier condition.
04
Prepare the substrate and install the approved cavity barrier system.
05
Check placement, fixings, continuity and required product-specific compression.
06
Photograph and obtain inspection sign-off at the agreed hold point.
07
Rebuild brickwork and make good to the project specification.
Typical work sequence
Works can include preparing the cavity, removing obstructions, installing the specified barrier system and rebuilding the affected masonry.

Compression and installation accuracy
Inadequate compression, poor fit or discontinuities can compromise the performance of certain cavity barrier systems.
Our team is experienced in working to tight tolerances, including projects where differences of less than 10 mm matter to the remedial detail.
There is no universal compression figure. The correct dimensions, compression and fixing arrangements are established from the selected product's tested specification and installation instructions, and we install to them.
Related façade and fire protection services
Discuss your façade remediation project
Contact Kilmurray Construction to discuss intrusive investigations, rainscreen strip-off and reinstatement, cavity barrier remedial works or coordinated external wall repair programmes.
Tender and enquiries
Office
39 High Street, Orpington, Kent BR6 0JE
Service area
United Kingdom